By Claire Trageser
Featured in the October 2010 Spray Foam Magazine
Jerry Prager, the owner of Waukesha, Wisc.-based MasterFoam Insulation company, was contracted by Oscar J. Boldt Construction to install spray polyurethane foam (SPF) to precise concrete wall panels in two new five-floor hospital towers. The job the lay before him was not going to be easy. Prager and his five-man crew would need to install a huge area-50,000 square feet (4,645.2m2)of SPF while working around other trades and staying prepared for some nasty weather conditions. Plus, the job needed to meet Air Barrier Association of America (ABAA) standards.
Click on the link below to read the article on how MasterFoam applied closed-cell spray foam using a Graco Fusion® CS spray gun and two Reactors®, a Graco E-30 and a Graco H-20/35 to meet architects’ specifications and ABAA standards. Additional information is highlighted about the Fusion CS Gun and MasterFoam Insulation’s participation in an OHSA’s (Occupational Safety and Health Administration) federal evaluation of SPF chemical risk factors.
Insulation Inside Hospital Walls
Showing posts with label Reactor® E-30. Show all posts
Showing posts with label Reactor® E-30. Show all posts
Thursday, December 30, 2010
Armory turned cool community center
By Jack Innis
Featured in the December 2010 Spray Foam Magazine
O’Neill Hall, former National Guard Massachusetts Militia Volunteers Armory, was transformed into the Fitchburg Senior Center. City planners soon found that the heating system was not able to adequately heat the center during winter activities.
Since this is a historical building, this project also had additional considerations such as providing a solution to meet the requirements of the architect and the Massachusetts Historical Commisssion. Click on the link below to find out how FoamRun, an SPF contractor, was able to apply spray foam using a Graco Fusion® Air Purge spray gun and Graco Reactor® E-30 proportioners.
Armory Turned Cool Community Center
Featured in the December 2010 Spray Foam Magazine
O’Neill Hall, former National Guard Massachusetts Militia Volunteers Armory, was transformed into the Fitchburg Senior Center. City planners soon found that the heating system was not able to adequately heat the center during winter activities.
Since this is a historical building, this project also had additional considerations such as providing a solution to meet the requirements of the architect and the Massachusetts Historical Commisssion. Click on the link below to find out how FoamRun, an SPF contractor, was able to apply spray foam using a Graco Fusion® Air Purge spray gun and Graco Reactor® E-30 proportioners.
Armory Turned Cool Community Center
NEW DIGS! SPF contractor insulates LEED-aspiring home
By Jessica A Baris
Featured in the December 2010 Spray Foam Magazine
A newly constructed 4,500 square feet home needed SPF insulation to earn Leadership in Energy and Environmental Design (LEED) certification points. Click on the link below to see how SealRite Spray Foam applied Demilec’s Heatlok Soy closed-cell foam with three Graco Reactor E-30 proportioners and were able to meet the requirements for LEED on the first inspection.
NEW DIGS! SPF Contractor Insulates LEED-Aspiring Home
Featured in the December 2010 Spray Foam Magazine
A newly constructed 4,500 square feet home needed SPF insulation to earn Leadership in Energy and Environmental Design (LEED) certification points. Click on the link below to see how SealRite Spray Foam applied Demilec’s Heatlok Soy closed-cell foam with three Graco Reactor E-30 proportioners and were able to meet the requirements for LEED on the first inspection.
NEW DIGS! SPF Contractor Insulates LEED-Aspiring Home
Tuesday, June 29, 2010
Graco® Reactor® used in World Trade Center project
Airseal Insulation Systems of Brooklyn, NY used a Graco Reactor E-30 to apply spray polyurethane foam (SPF) to help build One World Trade Center in New York City, according to a recent article in SprayFoam magazine.
Because of critical deadlines, the concrete for One World Trade Center needed to be poured in sub-freezing weather. The forms needed to be insulated or the concrete wouldn’t cure properly. Using Graco equipment, Airseal Insulation Systems insulated the concrete form for the core shaft of the building. Read more
Because of critical deadlines, the concrete for One World Trade Center needed to be poured in sub-freezing weather. The forms needed to be insulated or the concrete wouldn’t cure properly. Using Graco equipment, Airseal Insulation Systems insulated the concrete form for the core shaft of the building. Read more
Coming Soon: New proportioner packages
New Reactor proportioner packages with Graco® Fusion® CS, Fusion® AP or Probler® P2 guns will be available in the near future. Distributors: watch for an official Graco product bulletin in early July giving exact availability and pricing information.